De Anza College physical education complex to undergo $53 million renovation

08.07.2025    The Mercury News    2 views
De Anza College physical education complex to undergo $53 million renovation

For the first time in its nearly -year history De Anza College will see major upgrades to its aging physical schooling complex with plans for a million renovation expected to start next month The Foothill-De Anza Neighborhood College District Board of Trustees on Monday approved a million contract extension for tBP Architecture Inc the firm that created the original proposal to move forward with planning and design The project will be primarily funded by the state which is covering of the cost The remaining funds will come from the district s capital project reserves and Measure G bond funds The complex consists of six connected buildings which pose challenges relating to seismic safety accessibility hazardous material and code compliance according to the district s proposal to the state The complex has not had major upgrades since it was built in The renovations will cover around square feet of total space including square feet for physical instruction square feet for lectures and square feet reserved for offices according to the proposal The project does not include the pool area In addition to addressing safety issues the renovations will upgrade infrastructure to allow for more instrument use including multi-media tool for high-flex and hybrid courses and automated equipment such as shooting and serving machines The renovations also will expand instructional space to decrease physical mentoring enrollment waitlists and add infrastructure to allow for the installation of urgency lighting lockdown systems notification systems and fire alarm systems Site work will be limited to areas within feet of the buildings with only minor improvements planned for nearby paths and parking The Board of Trustees did not respond to a request for comment about the project The project has been in the works for several years The proposal was originally approved by the board in and received approval from the California Neighborhood Colleges Chancellor s Office in However it remained unfunded until a statewide K- teaching bond measure passed in fall which allowed it to move forward The renovation is listed as a priority in the district s five-year Capital Outlay Plan adopted last month From August through December the project gang will hold regular meetings with stakeholders to gather input on instructional necessities according to the firm s draft schedule Preliminary plans and designs are expected to be finalized by the spring of with construction slated to begin in August and wrap up by August

Similar News

Zebra at Rhode Island zoo dies in ‘tragic accident
Zebra at Rhode Island zoo dies in ‘tragic accident’ during intense thunderstorms

The 24-year-old zebra had been at the Roger Williams Park Zoo since 2003. The post Zebra at Rhode Is...

09.07.2025 0
Read More
Rodeo man charged with kidnapping in East Bay home
Rodeo man charged with kidnapping in East Bay home invasions

SAN LEANDRO — Police here believe they’ve identified one of four suspects in two home invasion robbe...

09.07.2025 0
Read More
How to Watch Lakers vs Spurs: Live Stream NBA Summ
How to Watch Lakers vs Spurs: Live Stream NBA Summer League, TV Channel

The NBA Summer League is officially underway at the California Classic as Bronny James and the Los A...

09.07.2025 0
Read More